I am considering re-plumbing my setup with a new sump so I can actually get into the sump to clean it out. I brilliantly added a refugium taller than (but only 2/3 the length of) my sump in front of the sump. I can get to the necessities but it is not easy.
I figure that I can pre-glue all of the PVC sections but there wll still be 3 connections (2 overflows and one return) that need to be glued to get everything hooked back into the tank. I plan on using unions at those connections but am wondering how long I should keep the tank offline to prevent any issues caused by glue/primer fumes from becoming an issue.
thanks,
- Steve
I figure that I can pre-glue all of the PVC sections but there wll still be 3 connections (2 overflows and one return) that need to be glued to get everything hooked back into the tank. I plan on using unions at those connections but am wondering how long I should keep the tank offline to prevent any issues caused by glue/primer fumes from becoming an issue.
thanks,
- Steve