- Location
- Kings Park, NY
If your interested I build them as a side job. Basically you pay material costs and a small labor fee. You can see one I am currently building for someone below. This stand would run about $400-500 depending on how detailed you want to go. That is a 75 pictured on it RR drilled in back corner. It would take me about 2-3 weeks to complete. The stand would easily hold a fully loaded 90. Glue and dowel construction. VERY stiff.



