nuch Babe it was on sale! Manhattan Reefs Location staten island Rating - 100% 99 0 0 Mar 21, 2014 #1 I want to run 2 reactors of my return pump and was wondering is it better to run a T off the main line with a cap on the end (pic B) or run the main line through the manifold back to the DT (pic A)? I'm no artist. Attachments 005.jpg 44.1 KB · Views: 53
I want to run 2 reactors of my return pump and was wondering is it better to run a T off the main line with a cap on the end (pic B) or run the main line through the manifold back to the DT (pic A)? I'm no artist.
nuch Babe it was on sale! Manhattan Reefs Location staten island Rating - 100% 99 0 0 Mar 21, 2014 #2 I know I have to put valves on each reactor. I forgot to draw that.
MikeC Advanced Reefer Manhattan Reefs Location Deer Park,Long Island,11729 Rating - 100% 213 0 0 Mar 21, 2014 #3 I ran mine like B no problems for two years now I used the 1/2 ball valves from HD.
jwisson Advanced Reefer Manhattan Reefs Location Hicksville, NY Rating - 100% 59 0 0 Mar 21, 2014 #4 I run mine like B as well. If you put a ball valve with a barb fitting at the end you can use it to do water changes as well.
I run mine like B as well. If you put a ball valve with a barb fitting at the end you can use it to do water changes as well.
nuch Babe it was on sale! Manhattan Reefs Location staten island Rating - 100% 99 0 0 Mar 21, 2014 #5 Btw I'm gonna use a quite one 6000 right under the DT which is a 93 qube. So the flow would be compromised?
Btw I'm gonna use a quite one 6000 right under the DT which is a 93 qube. So the flow would be compromised?