mandown123
Advanced Reefer
- Location
- Staten Island, NY
Can anyone help me with the process for plumbing a 75 drilled. It has a corner overflow and two fitted bulkheads in the bottom left corner. I think this is a standard 75 RR setup.
I need to know how to plumb this sucker, as I am very confused as how to go. I need to drilled out the stand below the 2 holes, and beyond that I am stumped. I am assuming PVC pipe has to hook into those two holes and go down to my 20G fuge tank.
Can someone help me out, or send links to detailed guides? Thanks so much!!
:givebeer:
I need to know how to plumb this sucker, as I am very confused as how to go. I need to drilled out the stand below the 2 holes, and beyond that I am stumped. I am assuming PVC pipe has to hook into those two holes and go down to my 20G fuge tank.
Can someone help me out, or send links to detailed guides? Thanks so much!!
:givebeer: