jaa1456 MR's Greatest Member Location Old Bridge/L.B.I. Rating - 100% 50 0 0 Dec 21, 2012 #21 The tank is now in place and the sump is all finished up, doing a leak test today and everything should be finished up by the end of next week.
The tank is now in place and the sump is all finished up, doing a leak test today and everything should be finished up by the end of next week.