Hi,
I was wondering if any of you are using Herbie's method (instead of Durso)
and also directly feeding an external (recirc) skimmer:
I am thinking that for my main drain, it'll go something like:
bulkhead
gate valve (herbie's method)
T fitting
-> horizontal goes straight to sump
-> vertical goes into another gate valve and then to skimmer
Is that the right way to do it or should I be putting the "herbie's" gate valve on the horizontal pipe going to the sump?
thanks.
I was wondering if any of you are using Herbie's method (instead of Durso)
and also directly feeding an external (recirc) skimmer:

I am thinking that for my main drain, it'll go something like:
bulkhead
gate valve (herbie's method)
T fitting
-> horizontal goes straight to sump
-> vertical goes into another gate valve and then to skimmer
Is that the right way to do it or should I be putting the "herbie's" gate valve on the horizontal pipe going to the sump?
thanks.