After fooling around for a few days it started to come together. There was a lot of trial and error but i finally got something going.
The structure is one piece now and was created with egg crate, rock, and foam and an exacto knife. It still needs another few days of work.
Epoxy Used: Bob smith Industries 2 part [20min]
When working with this foam it is very hard to judge how much it is going to expand. This made it very hard to keep this low profile and its hard to come out and say im 100% with the overall design. I figure once its running and colors up a bit that it will definitely slim it down with the contrasting colors.
I also decided that the 30c will use a 1/2" bulkhead/elbow combo instead of the 1" too reduce the flow.
No word from ADA yet, Guessing the cube is still stuck in customs. Hopefully they can get it out this week because i would really like to get this rolling along.
[i ran out of the pond foam so im working with some regular foam for the finishing touches]
Their is some freshly sprayed foam in the photo because im working on blending this all together.
i plan to make the cubes rock work too go hand and hand with this to make it all mesh together right.